Filter Projects:
Reset Filters
John F Ross Mechanical Upgrades
In a recent undertaking, our team faced a distinctive hurdle – designing an air handler that...
Laboratory Centre for Disease Control
As part of the larger Government “Energy Savings & Acquisition Program” There was an open spec...
248,828 sf Industrial Development in Burlington
Problem: The Burlington area is getting a brand new industrial development, which includes two divisible industrial...
Enhancing Learning Spaces: LG VRF Systems at Local Schools
Bringing cooling comfort to classrooms is just the beginning for LG VRF in local schools. These...
19 Centrepointe Dr.
Two new multi-residential towers have just been built in Ottawa at 19 Centrepointe and we were...
Meaford Long Term Care Home
The Meaford long-term care home is a new facility near Collingwood, Ontario, which features 77 beds...
Tartan Ave. Public School
The Waterloo Regional District School Board (WRDSB) was in the process of constructing their new public...
Etobicoke Waste Transfer Station
The Etobicoke Waste Transfer Station project was a design-build where the engineer specified a different Air...
Grand Harbour Building C – Krueger
The Grand Harbour Building C is an existing high-rise condo building in downtown Toronto with an...